Crendon Timber Engineering

The company partnered with GB NRG to install twelve impressive solar PV systems. Of which include; a 100kW at their East Harling site and a 573kW project at their St Ives site, setting a new standard for sustainable business practices

The Detail

Portfolio Size:

1903.19kWp

no. of panels:

4282 / 420Wp


Energy Output

This ground-breaking collaboration showcases the power of renewable energy and the potential for significant cost savings.

Est. Annual Generation (kWp)

1,393,227

Est. Return On Investment (ROI)

4 Years

EST. CO2 Reduced (Annually)

641 tons

OUR SERVICE


  • A zero cost no obligation energy audit on your business with options for how best to reduce your energy bills and carbon footprint
  • Our free commercial solar design offers tailored solar solutions engineered to meet energy needs, cutting-edge design that optimises space, and efficient power generation.
  • Professional installation of solar systems and battery storage for businesses, ensuring efficiency, sustainability, and optimal energy production
  • Our services encompass both reactive and preventative maintenance for commercial energy systems. We specialise in servicing and repairing solar PV systems

GB NRG have been a good partner for us in achieving what we wanted

ED KIRK – HEAD OF SUSTAINABILITY AT CRENDON TIMBER ENGINEERING GROUP

// Faq

How long did the install take?

All installs were completed between 2021-2023

What is the expected lifespan of the system?

The system is designed to last for 25 to 30 years or more.

BOOK YOUR FREE assessment HERE


Optimise commercial solar efficiency with a thorough energy assessment for peak performance.

Talk to us


Our team are here to help with enquiries and questions.Please use the form or contact number and we will getback to you right away.